The Netherlands, explained in English · Wednesday 25 November 2026Wed 25 Nov

News

Amsterdam A10 West link to A10 Zuid shuts 27–30 November

Drivers face 10 to 30 minutes of extra travel time while the Zuidasdok project lifts the last girders of a new fly-over into place at the De Nieuwe Meer interchange.

Yellow diversion signs and barriers at roadworks
iIllustrative photo: Josbert Lonnee / Public domain
knooppunt De Nieuwe Meer, Amsterdam · Map: © OpenStreetMap contributors, OpenFreeMap

Rijkswaterstaat is closing the connecting road from the A10 West, including the S107 on-ramp, to the A10 Zuid in Amsterdam. The closure runs from Friday 27 November at 22:00 until Monday 30 November 2026 at 05:00.

Why it matters

  • Traffic is being diverted via the A4 and A9.
  • Rijkswaterstaat expects 10 to 30 minutes of extra travel time.
  • Yellow signs and the overhead signs show the diversions.

The closure is needed so the Zuidasdok project can place the last 12 concrete girders of the new fly-over at the De Nieuwe Meer interchange. A large crane will do the lifting on the connecting road between the A10 West and the A10 Zuid, in the direction of the A1 to Hengelo and the A2 to Utrecht.

Rijkswaterstaat says the fly-over will be ready in autumn 2027. Destination traffic from the A10 Zuid to the A4 towards Schiphol and Rotterdam will then be able to use it.

The work is part of the widening of the A10 Zuid, which gets 2 extra lanes on each side. Through traffic will be separated from local traffic. Zuidasdok is a joint project of ProRail, the municipality of Amsterdam and Rijkswaterstaat.

See more of NLnow in Google: add it as a preferred source